Commercial Buildings
Conservatory of Villa Vavrečkova Zlín - summer months 2018
A complete implementation of atypical conservatory made of oversized semi-structural insulating glass for the gastronomic restaurant La Villa www.lavilla.cz.
The original element of the glass structure is the support of horizontally inserted insulating glasses by a vertical cladding.
Implemetation: 2017
Conservatory of Villa Vavrečkova Zlín
A complete implementation of atypical conservatory made of oversized semi-structural insulating glass for the gastronomic restaurant La Villa www.lavilla.cz.
The original element of the glass structure is the support of horizontally inserted insulating glasses by a vertical cladding.
Implemetation: 2017
RENAULT Praha
Five-meter high semi-structural glass supported by glass ribs.
Implementation: 2017
OC Chodov II
Production of oversized structural insulating glass panels with anchoring points and supply points powering individual letters of the OC Chodov logo.
Implementation: 2016
Svit Zlín Building No. 64.
Finally, a large-format glass installed in the former Bata’s Svit factory. We believe that this is just the beginning...
Implementation: 2016
Czech Technical University CIIRC
We supplied large format glazing for the Czech Institute of Informatics, Robotics and Cybernetics building.
Implementation: 2016
Zlín-Otrokovice Transport Company (DSZO) central ticket office
NOframe4 frameless glazing with oak openable elements.
Bent corner glass was also used within the NOframe4 system.
According to the information available, this was the world’s first installation of bent quadruple glass.
Implementation: 12/2014
Delta Prague
We contributed to this implementation by supplying large format glass.
Implementation: 2014
ELI Beamlines
The main goal of ELI Beamlines is to build the world’s most advanced laser centre. The centre will implement research and application projects involving interaction of light and matter at the intensity which is up to 10 times bigger than at present.
We were instrumental in contributing to this goal by delivering structural glass.
Implementation: 2014
Černý Most shopping Centre
Over 2,500 m² of facade and roof glazing of the shopping centre.
Glass composition:
SSunGuard SN 51 10 – 20 Stainless Steel – 66.2
Planibel Azur 8 ESG – 16 Stainless Steel – 6 ESG Low – E – 16 Stainless Steel – 55.2 Low – E
Implementation: 7 – 10/2012
BMW Prague
Structurally designed facade of a car showroom using double-sided safety glued glass.
Glass composition:
66.2 – 16 Stainless Steel DC 3362 – 66.2 Low – E
Implementation: 7–8/2012
Faculty of Electrical Engineering and Computer Science in Ostrava
Toughened enamelled glass cladding with a total area of over 5,000 m2.
Glass composition:
8 Clearvision ESG ENAMEL with glued sections
Implementation: 1–4/2012
MIURA mountain hotel
Structurally glazed facade using oversized glass with Vancheva colour interlayer.
Glass composition:
12 ESG HST – 16 Stainless Steel DC 3362 – 88.5 Low – E ESG/HST with 3 Vancheva colour interlayers
Implementation: 2/2011